MTL - After Being Forced To Become a Boss, I Just Want To Be a Salted Fish-Chapter 462 Impossible to get liquidated damages

If audio player doesn't work, press Reset or reload the page.

  Chapter 462 Liquidated damages are impossible to get

  Jiang Yu's words are not difficult to hear distressed.

  He also really loves Lu Ning.

  He has a lifelong friendship with Lu Zhi, and he treats Lu Zhi's children as his own.

   "In the future, we will love her more and love her more. I hope this child can get some spiritual comfort. By the way, let's send them the things I prepared last time, plus this time."

  The assistant nodded: "Okay, I'll arrange it right away."

   "Wait a minute, is there any movement on Jiang Zhe's side?"

   While talking, Jiang Yu's voice suddenly changed, and his tone of emotionless tone was close to indifference.

   "Not recently."

   "Okay. I see, you go."

  The assistant nodded, turned and left.

   After sitting on the chair for five minutes, Jiang Yu raised his hand and opened the first drawer on the left with a key.

   There is nothing in the drawer except a picture frame.

  Jiang Yu carefully took out the photo frame, and carefully wiped the photo frame with a special paper towel, even though it was spotless.

   After wiping, Jiang Yu looked at the photo in the photo frame. In the photo, a girl smiled warmly and had a gorgeous face. Jiang Yu looked at her with tenderness.

  He held the photo frame in his left hand, and the ring on his left ring finger was shining.

   "Yan'er, I told you about that girl, Lao Lu's daughter, the child named Lu Ning. You must also like that child. After suffering a bit, fortunately, she returned to her own side.

  If it was you, I would probably hug him and cry several times after hearing this, that child is strong.

  I always feel a bit like you. "

  He spoke to the person in the photo, his voice was as gentle as a gust of wind.

  Hope this wind can bring all the words to her ears.

  He smiled, and slowly touched the photo frame with his hand, as if he was stroking the girl's face.

  He smiled, but his eyes were red.

  Suddenly a breeze blew by his ears, Jiang Yu smiled, tears rolled down his eyes.

  How can there be wind in the airtight office? Probably the thoughts from the bottom of my heart have been heard.

  ——

  Sun Qian's parents sat outside the operating room in silence for a long time after sending Sun Lu into the operating room.

   “Those terminating contracts…”

   Grandmother asked suddenly, but stopped after halfway through.

   Grandfather sighed: "Don't think about it, we can't get the liquidated damages. Seeing Qianqian's appearance, things should be very troublesome. Let Zhou Li come over and ask."

   Grandmother nodded, raised her hand and took out her mobile phone to make a call.

  Grandfather looked at the lights above the operating room in a daze.

  Perhaps, have you really done something wrong for so many years...

  Zhou Li rushed to the hospital in a hurry, and the three went to talk in front of the glass window of the hospital.

  The grandparents don’t use the Internet at all, and they don’t know about the **** storm on the Internet, but judging from Sun Qianchen’s appearance, this matter is definitely not a trivial matter.

  The most recent thing about Sun Lu that the two of them can think of is the one related to Lu Ning.

  The two of them haven't done anything else to cover up for Sun Lu recently.

   Zhou Li came and saw that the two of them were completely ignorant, and didn't know what to say.

  But it is useless to say anything now, the matter has reached the point of no return.

  Zhou Li could only take out his mobile phone, and showed them while talking.

After telling the ins and outs of the matter, Zhou Li looked at the two and sighed: "Brother Sun, sister-in-law, you really messed up someone you shouldn't have offended this time. It's too thoughtless of you to do this. !"

  (end of this chapter)