©WebNovelPub
Previous chapter:
Chapter 28: Second Trial Reward
Next chapter:
Chapter 30: Protozoa
PREVIEW
... a clearly marked, vast space located in the middle section of the building. Only two paths are connected to this area. The first was a large ventilation system used to vent heat. Maximilian had already scanned the heat signature from this vent, and it was impossible to use. Its minimum temperature was 400 degrees Celsius, with a maximum reaching up to 600 degrees.
This was the only ventilation channel connected to the room, and it was clear that whoever designed it had no intention of le ...
YOU MAY ALSO LIKE